For the assembly of a power transformer, qualified technical personnel is required, with on-site testing equipment, thermal-vacuum equipment and tools designed especially for assembly purposes, meeting the international standards and following the manufacturer’s instructions. Our company has assembled power transformers from different manufacturers, amongst them Prolec G.E, Siemens, ABB etc.

Assembly of a three phase 150 MVA 220/110 kv autotransformer

Assembly of 4 50/83 MVA 500/110 kV transformers for storage and future usage.